Onshore

Shore power and charging for ferries and vessels

Why battery buffer at the quay?

Electric ferries and hybrid vessels need high charging power in a short time at the quay. The transition to emission-free maritime transport is accelerating, but port grid infrastructure doesn’t always keep up.

Battery charging of vessel at quay
⚠️
The Challenge

Upgrading the port’s grid connection can take a long time and cost large sums. Meanwhile, ferries must charge quickly – often in very short windows between departures. Without sufficient power, you risk delays.

Our Solution

With a battery buffer at the quay, you can store energy while the ferry is out on its route, and deliver high power when it docks. The system works as a power booster – you get MW-level charging even with limited grid connection.

From assessment to operation

We take responsibility for the entire process – from needs analysis to ongoing operation of shore power and ferry charging.

1
📋

Needs assessment

We analyze the ferry route, power needs at the quay, grid capacity and docking times to size the right system.

2
📝

Offer and grants

You receive an offer for battery buffer and charging infrastructure tailored to the ferry route. We assist with applications to Enova and other grant programs.

3
🔧

Installation and startup

We install battery buffer and charging system at the quay. Synchronization with the ferry schedule and training of port personnel.

4
🛡️

Service and maintenance

Around-the-clock monitoring and automatic operation. Preventive maintenance and fast emergency response ensure the ferry can always be charged on time.

What does battery buffer at the quay provide?

High power for ferries

Deliver MW power to electric ferries even with limited grid connection. The battery buffers energy and delivers full power when the ferry docks.

⏱️

Fast charging at quay

Electric ferries have short stays at the quay. Battery buffer ensures full charging power is available from the first second.

💰

Avoid grid upgrade

Upgrading the port’s grid connection is expensive and time-consuming. Battery buffer gives you the power you need – faster and at lower cost.

🌿

Zero emissions at quay

Electric operation eliminates local emissions and noise in the port area. Better air quality for both employees and local residents.

🔄

Adapted to ferry schedule

The system synchronizes with ferry schedules. The battery charges between arrivals and is always ready when the ferry comes.

📊

Automatic control

Playmaker software monitors and controls the system automatically. Optimal charging and buffering without manual intervention.

Uptime for the ferry route

Ferries run on schedule. The charging system must be ready when the ferry docks. With a service agreement we ensure uptime.

SCADA monitoring

Real-time monitoring of charging infrastructure

Remote support

Troubleshooting and optimization without waiting

Fast emergency response

On-site support when remote isn’t enough

Reporting

Documentation of energy consumption and charging sessions

Training

Training of port personnel

Preventive maintenance

Scheduled service visits for maximum lifespan

Planning to electrify your ferry route?

We help ports and ferry companies size the right charging infrastructure. Get in touch for a no-obligation conversation about your needs.

Other solutions

Construction

The technology behind emission-free construction sites.

Tunneling & Mining

Emission-free operations underground – better work environment, lower costs.

Transport & Logistics

Charging infrastructure for heavy freight, fast charging stations and public transit.

Industrial Park

Shared energy infrastructure for industrial parks – one battery, many services, shared value creation.