Hybrid Installation

Combine hydro, solar or wind power with battery for better performance and new revenues.

Hydropower + Battery = Hybrid

Hydropower plants have been the backbone of Norwegian power production. But turbines wear out with frequent regulation, and response time is too slow for the fastest reserve markets. With a battery system alongside, you can protect the turbines, deliver faster response, and better utilize existing facilities.

Hybrid installation in Norwegian nature
⚠️
The Challenge

Every time the turbine regulates up or down, mechanical components wear out. FCR requires faster response than the water masses allow. The result is that many hydropower plants avoid the most profitable reserve markets.

Our Solution

A battery system handles the fast fluctuations and lets the turbine run smoother. The battery responds in milliseconds and delivers FCR, while the turbine follows with a few seconds delay. Wear is reduced, and the plant gains access to new markets.

Solar, Hydro and Wind in Perfect Balance

Hybrid installations combine multiple production sources — but deviations from the plan cost money. Playmaker integrates production plans from solar, hydro and wind, and uses the battery to cover the difference in real time.

When production deviates from the plan, the battery is automatically activated to cover the difference — no imbalance fees.

See how in Playmaker
Real-time Balancing
☀️Solar
2.4/2.8
MW
-0.4 MW deviation
🔋BatteryCompensating+0.4 MW
Delivered2.8 MWAs per plan
No imbalance cost

From assessment to operation

We take responsibility for the entire process – from analysis of the hydropower plant to ongoing optimization of the hybrid installation.

1
📋

Needs assessment

We analyze the hydropower plant's capacity, regulation patterns and market opportunities to size the right battery system.

2
📝

Offer and grants

You receive an offer for a battery system with revenue forecast for FCR markets. We assist with applications to Enova and other relevant grant programs.

3
🔧

Installation and startup

We install the battery system at the power plant, integrate with the turbine control and prequalify for FCR markets.

4
🛡️

Service and maintenance

Playmaker coordinates battery and turbine automatically. We take care of monitoring, maintenance and monthly settlement from reserve markets.

What does a hybrid installation give you?

⚙️

Reduced turbine wear

The battery handles the fast fluctuations so the turbine can run smoother. Fewer start/stop cycles extend the lifetime of the entire plant.

FCR prequalification

With battery, the hydropower plant can be prequalified for FCR-N and FCR-D – markets that require faster response time than the turbine alone can deliver.

Faster response time

Batteries respond in milliseconds. Hydropower takes longer. The hybrid installation combines the best of both worlds.

💰

Increased revenue

Access to more reserve markets means more revenue streams. Playmaker automatically optimizes between FCR-N, FCR-D and potentially mFRR.

🔋

Flexible capacity

The battery can be sized according to needs. Start small and scale up as you see the value.

🛡️

Extended lifetime

When the turbine runs smoother, it lasts longer. The battery takes the hit and protects the most valuable part of your installation.

Optimal hybrid operation

A hybrid installation requires coordination between battery and turbine. With a service agreement we ensure both operate optimally together.

SCADA monitoring

Real-time monitoring of battery and turbine

Playmaker control

Automatic coordination between battery and turbine

Fast emergency response

On-site support when needed

Settlement and reporting

Overview of revenue and performance

Training

Training of operations personnel

Preventive maintenance

Scheduled service visits for maximum lifespan

Ready to utilize your hydropower better?

We analyze your hydropower plant and show what a hybrid installation can do for you – reduced wear, new FCR revenues, and extended lifetime.

Other solutions

Construction

The technology behind emission-free construction sites.

Tunneling & Mining

Emission-free operations underground – better work environment, lower costs.

Transport & Logistics

Charging infrastructure for heavy freight, fast charging stations and public transit.

Industrial Park

Shared energy infrastructure for industrial parks – one battery, many services, shared value creation.